I just wanted to post a few more pictures now that the floor is finished. Some of these are taken from the 2nd floor mezzanine.
Sunday, February 1, 2009
Applying First Coat of Floor Finish
I don't know if I mentioned that three of the guys from System Three came to the site for the application of the first coat of floor finish. System Three manufactured all of the resin for this project and custom tinted it, too. I also used their urethane top coat for the columns, seats, and platforms. For the floor, they're chemist, John Bartlet, formulated a custom coating using the most durable, water-based urethane combined with robust UV inhibitors to protect the epoxy and pigments. He worked with my floor guy, Craig Munson from Seattle Floor Service, to make sure it was a top notch product. Below, Tyler is wiping the floor clean after sanding to prepare for finishing.
Here's Craig applying finish. I'm behind the post with my applicator desperately trying not to screw the finish up like I did with my hardwood floors in my own house.