This is a shot from the 2nd floor mezzanine that overlooks the lobby. While the architects have been great to work with and have done an excellent job designing the lobby space, they did accidentally forget about an HVAC register that ended up being placed right above the platform.
Saturday, January 10, 2009
2nd half of decking installed
I stopped by Rollin Street today to inspect the finished concrete work that my floor tiles will sit on. I took some photos of the upper deck that we installed last Tuesday. I hadn't taken any photos while we were installing because it was such a tremendous pain in the ass to install that there was no time for such frivolities.
This is a shot from the 2nd floor mezzanine that overlooks the lobby. While the architects have been great to work with and have done an excellent job designing the lobby space, they did accidentally forget about an HVAC register that ended up being placed right above the platform.
This is a shot from the 2nd floor mezzanine that overlooks the lobby. While the architects have been great to work with and have done an excellent job designing the lobby space, they did accidentally forget about an HVAC register that ended up being placed right above the platform.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment