Tile installation: Day two
Joe, Evan, and John came back on Thursday for the second day of installing tiles. Actually, it turned out to be their last day because they finished a day ahead of schedule. They credited the righteous sub floor making their job so easy. All modesty aside, I'd have to agree.
Here's a picture looking down from the mezzanine. The blue X's mark the locations of seating elements.
Joe provides a scale reference to the columns and platform.
The tiling crew, John, Joe and Evan, standing on top of their excellent work.