Saturday, January 17, 2009

Tile installation: Day two


Joe, Evan, and John came back on Thursday for the second day of installing tiles. Actually, it turned out to be their last day because they finished a day ahead of schedule. They credited the righteous sub floor making their job so easy. All modesty aside, I'd have to agree.


Here's a picture looking down from the mezzanine. The blue X's mark the locations of seating elements.

Joe provides a scale reference to the columns and platform.


The tiling crew, John, Joe and Evan, standing on top of their excellent work.