Wednesday, January 14, 2009

Tile installation: Day 1

Joe Boscacci and his colleagues, Evan and John, showed up today to install tiles. We spent the first half of the day figuring out how we would maintain our grid. They were very thorough in preparing before installing the first tile, pictured above.

This is what they got done in the second half of the day. They went way faster than anyone was expecting. They said it was due to having a really righteous sub floor (see previous post for more sub floor bragging.)

The blue X's are where Tyler and I will place the seat blocks tomorrow. The reveal between tiles will get filed with cork grout next week.